Skip navigation
advertisement

Bay Bridge reopens after nearly 6-day closure

Span had been closed since two rods, crossbar fell into rush-hour traffic

Image: Bay Bridge
Jeff Chiu / AP
Traffic is flowing again on the San Francisco-Oakland Bay Bridge, shown in Yerba Buena Island on Monday.
Video
  Bay Bridge opens for business
Nov. 2: San Francisco's Bay Bridge reopened Monday after a five-day closure. Traffic remained light as commuters continued to take alternate routes. NBC's Brian Williams reports.

Nightly News

  Photo features  
  More
AP
Year in Pictures 2009
Experience an audio slide show of the best news and sports images from around the world and close to home.
Image: Andrews Air Force Base
AP
PhotoBlog
View and discuss the pictures and issues that caught our eyes.
updated 3:17 p.m. ET Nov. 2, 2009

SAN FRANCISCO - Nearly a week of frustration ended for commuters when the San Francisco-Oakland Bay Bridge reopened Monday following emergency repairs.

Traffic began moving across the span after two rods and a crossbar were replaced and passed vibration and other tests, said Bart Ney, a spokesman for the state transportation department.

"I know that it's been difficult," he said. "But we're happy to be returning the Bay Bridge to public service."

Story continues below ↓
advertisement | your ad here

Cars lined up at the toll plaza shortly before the opening. The first vehicles allowed to cross the bridge's upper deck were led by a line of California Highway Patrol cars.

The span was closed for nearly six days after 5,000 pounds of metal came crashing down into rush-hour traffic Tuesday evening when the two rods and crossbar failed. The parts had been installed over the Labor Day weekend to repair a crack.

One person sustained minor injuries and three cars were damaged when the metal fell.

Test failure
Workers installed new rods, but a test Saturday showed the rods were rubbing against metal, which could cause them to fail, said Lauren Wonder, a spokeswoman for the state department of transportation.

The parts had to be reworked on Sunday.

The new fix includes anti-vibration dampeners and measures to prevent parts from falling on the bridge if they fail again, Ney said.

Click for related content

The closure — the longest since the bridge was shut down for a month after the 1989 Loma Prieta earthquake — had snarled traffic on area roads, as the roughly 280,000 commuters who use the bridge each day looked for alternate routes.

The Bay Area Rapid Transit Agency ran longer trains and provided overnight service over the weekend.

Copyright 2009 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Sponsored LinksGet listed here
Online College Courses
Boost your career with an online Degree. Pick from Leading Colleges!
www.EarnMyDegree.com

Sponsored links

Resource guide