Skip navigation

Doomed bridge’s weakest areas carried 191 tons

Investigators highlight heavy load piled on Minn. crossing before collapse

Image: Collapsed bridge
The Interstate-35W bridge that fell into Mississippi River in Minneapolis last August, killing 13 people, had heavy loads of construction materials sitting on top of weak points, a federal report says.
Craig Lassig / EPA file
Interactive
Check the bridges on your route
Enter a starting point and destination to see the condition and inspection dates of spans you cross.
Images of bridge tragedy  
  More
AP
Aftermath of tragedy
Authorities search through rubble after deadly Minneapolis bridge collapse, while a community grapples with loss.
Major Freeway Bridge Collapses In Minneapolis During Rush Hour
Getty Images
Mourning the victims
Friends and family grieve over the casualties of the Minn. bridge collapse.
AP
Bridge collapse
A span of freeway plunges into the Mississippi River during rush hour in Minneapolis.
Video: Life  
Father speaks out in disappearance of missing woman
  Dec. 15: Chuck Cox, the father of a young Utah mother who went missing more than a week ago, talks to TODAY's Natalie Morales about his daughter's family life before her disappearance and his hopes for the woman's husband and children.

  Photo features  
  More
Image:
AP
  The Week in Pictures
A fiery protest in Greece, Baghdad bombing, winter winds, a cold dip in China, a relaxing bath in Hungary, police officers remembered and more news and feature images from around the world.
A hunting hawk chases a rabbit
Reuters
PhotoBlog
View and discuss the pictures and issues that caught our eyes.
updated 2:10 p.m. ET March 18, 2008

MINNEAPOLIS - More than 191 tons of construction material had been piled over the weakest areas of an interstate bridge that collapsed last August, according to federal investigators.

In a followup to a preliminary report released in January, the National Transportation Safety Board report that the piles of rock and sand were placed over steel plates that were thinner than they should have been.

Calculations by the agency have determined that the bridge in Minneapolis was carrying a 630-ton load at the time it fell into the Mississippi River. About half of that load was sitting on the center span.

The Aug. 1  collapse killed 13 people and injured 145.

The NTSB had previously cited the too-thin gusset plates and construction project weights as factors in the collapse, but Monday's update included drawings and tables that pinpointed the locations of those heavy loads on the structure.

The agency also said it had gotten "archival information" from an engineering company that may help explain how the bridge ended up with thin gusset plates when it was opened in 1967.


The NTSB had said in January that some of the steel plates were too thin and were fractured. Chairman Mark Rosenker called the plates "the critical factor" in the failure but stopped short of saying they caused the collapse, saying investigators couldn't find the original design calculations.

However, the NTSB now says the Jacobs Engineering Group, which acquired the company that was the original design consultant for the bridge, has provided information "to help investigators better understand what type of system of checks and balances would have been in place when the bridge was designed back in the 1960s." The company acquired by Jacobs was Sverdrup & Parcel.

The NTSB update gave no details on that new information, and NTSB spokesman Terry Williams wouldn't elaborate. Representatives of Jacobs Engineering didn't return a call seeking comment Monday.



advertisement | your ad here

© 2009 The Associated Press. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Sponsored LinksGet listed here
Online College Courses
Boost your career with an online Degree. Pick from Leading Colleges!
www.EarnMyDegree.com

Sponsored links

Resource guide